Decoiler retrofit
The decoiler used a pneumatic cylinder in its actuation system. The scope was to replace it with screw actuation adapted to the existing machine.
View projectWhen a mechanism limits a process or needs refurbishment, we assess the machine and develop the mechanical intervention. Our scope can cover design, component fabrication and assembly, according to the identified requirements.





The decoiler used a pneumatic cylinder in its actuation system. The scope was to replace it with screw actuation adapted to the existing machine.
View project
The cleaning component required frequent replacement. A solution was needed that allowed the wear elements to be replaced without changing the entire disc.
View project
Tubes were leaving a production stage with excess fluid on the outside of their ends. A device suited to this application was needed at that point in the process.
View project
The mold bases on an industrial carousel needed their positioning and mounting points restored. The work had to be carried out on the existing equipment, taking the assembly geometry into account.
View project
The stacking mechanism on a wet-wipe machine had an alignment limitation. Its movement needed to be reviewed and a solution adapted to the machine already in production.
View project
The drive guide on an industrial carousel required replacement. To carry out the work on site, the replacement components had to be fabricated and prepared in advance.
View project
The connection between the gearbox and agitator needed to be redesigned to address misalignment and contamination issues. The solution had to fit the existing equipment and installation.
View project
The timing drive on a wipe grouping machine needed changes to its transmission and component arrangement. The retrofit had to retain the existing machine and integrate the new assembly into its mechanism.
View project